Answer:
It must have an angle of exactly 24°.
Step-by-step explanation:
Answer:
It must have an angle of exactly 24°.
Step-by-step explanation:
I got a 100% on my mastery test
hi if you need help you can tell me
Answer: Nope, im currently doing well right now. Thank you though.
Step-by-step explanation:
What is the equation of the line that passes through the point (-6,8) and has an undefined slope?
Answer:
x = -6
Step-by-step explanation:
Slope is rise over run (change in y divided by change in x), and to have an undefined slope change in x must be zero. The line x = -6 is a vertical line that passes through the point (-6,8).
PLEASE HELP
What is the volume of the cylinder?
A. 60.0 cm3
B. 120.0 cm3
O C. 188.4 cm
D. 300.0 cm3
E. 942.0 cm
Answer:
i think E.942 cm³ is answer
Volume = πr²h
so
3.14×5×5×12
= 942 cm²
the local store where tim shops charges a 7% sale tax for clothing complete the table by figuring the cost of jeans after tax is applied the first row is done
Answer:
$51.36
$77.04 i think
Step-by-step explanation:
Multiply the cost of the number of pairs of jeans by the sales tax amount, 7%.
cost of 2 pairs: 48 + 7/100 x 48 = $51.36
cost of 3 pairs: 72 + 7/100 x 72 = $77.04
Heres an easy question. Solve this.
[tex]\frac{1}{5}[/tex]y = 10
Answer:
y=50
Step-by-step explanation:
[tex]\frac{1}{5}[/tex]y=10
y=10÷[tex]\frac{1}{5}[/tex]
=50
The standard error of is the _____. Group of answer choices variance of variance of the sampling distribution of standard deviation of the sampling distribution of difference between the two means
Answer:
standard deviation of the sample distribution of the difference between these two sample means
Step-by-step explanation:
how much solutions does 2x = 2x + 1 have?
Answer:
no solution
Step-by-step explanation:
hope this helps! :D
have a miraculous day!! <3
The angle of elevation to a nearby tree from a point on the ground is
measured to be 38°. How tall is the tree if the point on the ground is 77 feet from the tree? Round your answer to the nearest tenth of a foot if necessary.
Answer:
Step-by-step explanation:
tan 38 = opp/adj = h/77
h = 77tan38
h = 60.1589932...
h = 60.2 ft
2+2 (I have been struggling on this for a long time)
The triangle and rectangle belowhave the same area what is the value of w?
(I[m Assuming W =10cm)
the formula for area of a triangle is 1/2 times the base (4 cm) times the height (5 cm) so the area of the triangle would be 10 cm. to find the area of the rectangle you would divide 10 by 4, which means that w=2.5 cm
Mrs. terrance has a large bin of 236 crayons. She divides them equally among four containers.
What's The Interest Rate?
I = $200
P = $800
T = 24 months
At a sale this week, a digital camera is on sale for $547.40. This is a 57% discount off of the original price. What is the original price
Answer:
725.623
Step-by-step explanation:
547.40:?
43 :57
?=547.40×57÷43
find the numbered angles 1 to10
Answer:
6
Step-by-step explanation:
im not sure but I think 6 is the answer
How many roots will the function f(x)= -3x³ - x² + 7x + 6 have?
Answer:
It will have 3 roots
The number of roots in an equation equals the highest power of that equation.
Step-by-step explanation:
Sam has 60 toy cars. 20% of the cars are red.
How many cars are red?
A. 12
B. 20
C. 48
D. 40
Answer:
A
Step-by-step explanation:
20% of 60 is 12
Hope that helps
Shabana earns £1900 a month. She is awarded a 1% pay rise. What is her new salary?
Plz answer. No spam links.
Answer: 1919 will be the final amount
Step-by-step explanation: 1 percent of 1900 is 1900/100=19
add this to 1900
this will get you 1919
brainliest pls
Rationalize the denominator and simplify.
6
15 - 3
Answer:
[tex]a)6 = \frac{6}{1} = 6 \: \: \: b)15 - 3 = \frac{15}{3} = 5[/tex]
How many 1/4 inch cubes does it take to fill a box with width 1 inches, length 3 3/4 inches and height 1 1/2inches?
Step-by-step explanation:
we need to see how many cubes fit into every dimension.
we can fit 4 cubes along the 1 in width. as 4×1/4 = 1 in.
we can fit 15 cubes along the 3 3/4 in length :
3 3/4 = 12/4 + 3/4 = 15/4
15/4 / 1/4 = 15/4 × 4/1 = 4×15 / 4×1 = 15
we can put 6 cubes on top of each other fit the height of 1 1/2 in
1 1/2 = 2/2 + 1/2 = 3/2 = 6/4
6/4 / 1/4 = ... = 6 (as above - simply 1/4 fits 6 times into 6/4).
so, we have
4 × 15 × 6 = 360
we need 360 cubes to fill the box.
The area of a triangle is 83 square feet. The base is twice the height. Find the height.
Answer:
166
Step-by-step explanation:
83x2(twice the height)
Gonna be sending in quite a few of these lol thanks
Answer:
A
Step-by-step explanation:
Simply multiply each rows of the firstly stated matrix by the columns of the second and then add each with respect to their location.
During a 12-hour car ride, each of 4 family members gets to choose the music for an equal amount of time. Write an equation, where t is time, to find out how long each member of the family is in charge of selecting the music.
What is the gradient of the graph shown?
Give your answer in its simplest form.
Answer:
m = —1/3
Step-by-step explanation:
There are two clear points shown on the graph
point 1: (0;3)
point 2: (6;1)
[tex]m = \frac{y2 - y1}{x2 - x1} [/tex]
[tex]m = \frac{1 - 3}{6 - 0} [/tex]
[tex]m = - \frac{2}{6} [/tex]
[tex]m = - \frac{1}{3} [/tex]
Emple
Six pounds of grapefruit cost $3. What is the cost per pound?
You can use a double number line to help you find ate and
unitate Start with the ratio you know: 53 for 6 pounds
Divide both 53 and 6 pounds by 3 to get 1 for 2 pounds
Then divide 51 and 2 pounds by 2 to find the cost per
pound, which is so. So for 1 pound.
1
Notice that you can also divide 3 by 6 to get the cost per
pound directly
In the example, how much would it cost to buy 3.4 and
5 pounds of grapefruit? Explain how you found your
answers
Answer:
0.50
Step-by-step explanation:
4/10 proportional to 6/15
Answer:
Nooooooo
Step-by-step explanation:
A group of students organized a car wash to raise money for a local charity. The students charged $9.99 for each car they watched.In 3.5 hours they washed 14 cars.at that rate how much money could they earn in 8 hours?
Answer:
First you would divide 12 cars by 3 hours to see how many cars get washed per hour
Then you know that 4 cars get washed in one hour so you multiply it by $5.00 because you want to see how much money they earn in one hour
After you know they earn $20.00 per hour you multiply that by 8 because you want to see how much money they earn in eight hours
So your final answer is $160 for washing cars in 8 hours
which of the following angle measure combinations will form a triangle?
A. 47° degrees, 63 degrees, and 70 degrees
B. 160 degrees, 50 degrees, and 150 degrees
C. 90 degrees, 1 degrees, and 88 degrees
D. 182 degrees, 1 degrees, and 2 degrees
Pls Find the value of x
[tex]x + 104 + 28 = 180 \\ (140 + 28 = 132) \\ x = 132[/tex]
[tex]\sf\longmapsto x + 104 + 28 = 180[/tex]
[tex]\sf\longmapsto x = (104 + 28) = 132[/tex]
[tex]\sf\longmapsto x = 132[/tex]
Simplify. Solve as fast as possible.
Answer:
-5y
Step-by-step explanation:
[tex]\sqrt{y^2}[/tex] = y if x > 0
-5[tex]\sqrt{y^2}[/tex] = -5y
Mr. Herman's class is selling candy for a school fundraiser. The class has a goal of raising $500 by selling c
boxes of candy. For every box they sell, they make $2.75.
Write an equation that the students could solve to figure out
how many boxes of candy they need to sell.
Answer:
500=2.75c
Step-by-step explanation:
500= 2.75c
Isolate c by dividing 2.75 on each side
500/2.75 =181.818181818 which is about 181.8
So the students need to sell about 181.8 boxes of candy in order to reach their goal of $500.